PASSLEADER C_TSCM42_65 free dumps exercising fabric is going to have fun with a critical factor in the steps involved in setting up a audit. Them but not only caters you actually the information in connection with the Audit C_TSCM42_65 and presents you actually great analysis fabric that creates a SAP Use Correlate documentation audit entirely possible that you actually. PASSLEADER provide you with an intensive examine resolution that can assist you develop into SAP professional qualified. C_TSCM42_65 groundwork direct contains absolutely free analysis direct, example problems plus the answers, pdf file audit, mental puts plus the answers clinical this provide the connection with specific C_TSCM42_65 examine.

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the “simulation mode” option
C. Total planning online
D. Multi-level single-item planning with the “display material list” option

Answer: B

QUESTION 2
What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.

Answer: D

QUESTION 3
Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM

Answer: BCE

QUESTION 4
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes

Answer: BDE

QUESTION 5
Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.

Answer: BD

QUESTION 6
Where can you define the valid receivers for production order costs?

A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant

Answer: C

http://www.passleader.com/c-tscm42-65.html

PASSLEADER apply examine problems are fashioned by way of really expert plus professional training organisations that are fitted with created the perfect C_TSCM42_65 sample questions that should provide being successful against your audit. By way of obtaining PASSLEADER Specific lab tests audit concern that is definitely continually up to par, you will get the only thing that is needed to get creating a audit problems.